Skip to content

Quality System

Quality System & Standards


The standards, traceability and management arrangements that govern the work described on this site.

StandardISO/IEC 17025:2017
Disciplines3

Overview

Calibration and performance verification work described on this site is performed by laboratories accredited to ISO/IEC 17025:2017. Accreditation, the scope document, and the certificate number belong to the laboratory that performs the measurement. This business scopes each request against that laboratory's published scope of accreditation before a quotation is issued, and manages the paperwork and scheduling the request generates.

Standards Referenced

Work described on this site is performed under ISO/IEC 17025:2017.

Accreditation, where it is referenced anywhere on this site, is the accreditation held by the laboratory that performs the work, and it extends only to the measurements listed in that laboratory's published scope. Measurements outside a published scope are performed and reported as non-accredited work and are identified as such on the certificate. No accreditation is claimed here that is not held by the party performing the measurement.

The documentation that accompanies a quotation is explained on the accreditation documentation page.

Metrological Traceability

Measurements reported on resulting certificates are traceable to the SI through NIST. The chain of comparisons and stated uncertainties is documented on the certificate itself. Certificates state the reference standards used, the measured results with units, the measurement uncertainty, and a decision rule wherever a statement of conformity is given. Where adjustment or repair occurred during the same visit, both as-found and as-left results are recorded, and an out-of-tolerance as-found condition is reported before any adjustment is made so a reverse-traceability impact assessment can be run if needed.

Traceability is captured at the level of the measurement. The certificate records which reference was used, how that reference stood in its own calibration interval, and the chain that links it to the SI unit. Where a reference is subsequently found out of tolerance, work measured against it since its previous calibration is reviewed and affected parties are notified.

Equipment and Maintenance

Requests are scoped across bridge, gantry and cantilever coordinate measuring machines, portable articulated arms, granite surface plates, gauge blocks, and ring and plug gauges. Rotary tables used as a fourth axis are tested under ISO 10360-3, and multisensor or non-contact frames such as laser trackers fall under ISO 10360-9 and ISO 10360-10 where applicable to the configuration supplied. Each category is matched to a performing laboratory's accredited scope by instrument type, range and the uncertainty the customer's tolerance requires. Accredited and non-accredited items are identified separately on the quotation and on the certificate, and records are retained in a form that can be retrieved at short notice for a registrar or customer audit.

Reference equipment is individually identified and kept under controlled conditions, with a defined recalibration interval that is shortened where drift data supports it. Items that have been damaged or overloaded, or that give results which do not stand up, are withdrawn and labelled, and are not used again until checked and released in writing.

Management System

The work sits inside a documented management system:

  • 01

    Controlled documents

    Procedures carry issue and revision status.

  • 02

    Retained records

    Retained for a defined period and retrievable against a certificate number.

  • 03

    Audit and review

    Internal audit and management review run on a schedule.

  • 04

    Corrective action

    Nonconforming work and improvement actions are tracked to closure, and their effectiveness is checked afterwards.

Impartiality and Complaints

Impartiality risks are assessed and controlled, and findings are reported as measured even where the commercial result is unwelcome. Complaints and appeals are treated as a formal input rather than an inconvenience — the process, including the response commitment, is set out on the complaints policy page. How results should and should not be read is covered on the disclaimer page.

Compiling records for a supplier-qualification file?

Scope, method statements and traceability detail are supplied with the quotation.

A written quotation follows by email.